WE PROVIDE CASE STUDY ANSWERS, ASSIGNMENT SOLUTIONS, PROJECT REPORTS AND THESIS
ARAVIND - 09901366442 – 09902787224
SOFTWARE PROJECT MANAGEMENT
1. You have been
appointed a Project manager for a major software products company. Your job is
to manage the development of the next generation version of its widely used
word-processing software. Because new revenue must be generated, tight
deadlines have been established and announced. What team structure would you
choose and why? What software process model(s) would you choose and why?
2. You have been asked
to develop a small application that analyzes each course offered by a
university and reports the average grade obtained in the course (for a given
term). White a statement of scope that bounds this problem.
3. Use the COCOMO II
Model I to estimate the effort required to build software for a simple ATM that
produces 12 screens, 10 reports, and will require approximately 80 software
components, Assume average complexity and average developer/environment
maturity. Use the application composition model with object points.
4. Develop a spreadsheet
model that implements one or two of the estimation techniques described in this
chapter. Alternatively, a acquire one or more on-line models for software
project estimation from web-based sources.
5. A system has 12
external inputs, 24 external outputs, fields 30 different external queries,
manages 4 internal logical files, and interfaces with 6 different legacy
systems (6 EIFs). All of these data are of average complexity, and the overall
system is relatively simple. Compute FP for the system.
6. Give at least three
examples in which black-box testing might give the impression that everything’s
OK, while white vox tests might uncover an error. Give at least three examples
in which white-box testing might give the impression that “everything’s OK,”
while black-box tests might uncover an error.
Software
Project Management
1. How does the requirement process can be
explained?
2. What is step wise project planning?
Draw a diagram for an overview of stepwise planning.
3. i) Write the basis for software
estimating
4. What is network planning model? How to
formulate network model?
5. Explain the method of estimating the
duration of an activity.
6. Explain top-down project schedule plan.
7. Explain the functions and
responsibilities of software configuration management.
8. Discuss in detail any one tool for
project management.
9. Discuss risk management in software
development.
10. Write a case study of a Software Project
Management System for an automated education system which contains the
requirement, gathering, planning, Implementation, Test Cases and Staffing.
Software
Project Management
1. What is LOC? Explain disadvantage of this method
as a measure of size of a software. Compare Halstead’s length and volume
measures of size with LOC measure by giving suitable example.
2. What is the use of the following tools in
Software Project Scheduling? Also, mention its significance:
i) WBS
ii) CPM
iii)PERT charts
3.
Suppose you are
developing a software product in the organic mode. You have estimated the size
of the product to be about 1,00, 000 lines of code. Compute the nominal effort
and development time.
4. What is a Software Process? Why it is required to
model a software process? List various tools available for process modeling.
Explain any one tool with an example.
5. Define term resource in Project Management. What
types of resources are required to develop a software project? Explain the
significance of resource allocation phase.
6. What is significance and role of Project Closure
Analysis in Software Project Management? Write steps to perform closure
analysis.
7. What is Software Reliability? How it is different from Hardware
Reliability?
8. Why is it important to track the progress of a
project? Explain various monitoring and controlling techniques to track the
project progress.
WE PROVIDE CASE STUDY ANSWERS, ASSIGNMENT SOLUTIONS, PROJECT REPORTS AND THESIS
ARAVIND - 09901366442 – 09902787224
No comments:
Post a Comment